| LOW COST |
| No. |
Description |
Amount (KES) |
| 1 |
SUBSTRUCTURE & GROUND FLOOR SLAB (PROVISIONAL) |
1,020,000.00 |
| 2 |
REINFORCED CONCRETE FRAME |
255,000.00 |
| 3 |
WALLING |
306,000.00 |
| 4 |
ROOF STRUCTURE, COVERING AND RAINWATER DISPOSAL (PROVISIONAL) |
306,000.00 |
| 5 |
WINDOWS |
255,000.00 |
| 6 |
DOORS |
204,000.00 |
| 7 |
INTERNAL FINISHES |
1,275,000.00 |
| 8 |
EXTERNAL FINISHES |
306,000.00 |
| 9 |
FITTING AND FIXTURES (JOINERY) |
204,000.00 |
| 10 |
PROVISIONAL SUM FOR PLUMBING WORKS |
306,000.00 |
| 11 |
PROVISIONAL SUM FOR ELECTRICAL WORKS |
255,000.00 |
| 12 |
PROVISIONAL WORKS AND PRIME COSTS |
408,000.00 |
| TOTAL |
5,100,000.00 |
*Low Cost assumes construction in rural areas with low labor rates on a labor contract with budget finishes.
| MEDIUM COST |
| No. |
Description |
Amount (KES) |
| 1 |
SUBSTRUCTURE & GROUND FLOOR SLAB (PROVISIONAL) |
1,360,000.00 |
| 2 |
REINFORCED CONCRETE FRAME |
340,000.00 |
| 3 |
WALLING |
408,000.00 |
| 4 |
ROOF STRUCTURE, COVERING AND RAINWATER DISPOSAL (PROVISIONAL) |
408,000.00 |
| 5 |
WINDOWS |
340,000.00 |
| 6 |
DOORS |
272,000.00 |
| 7 |
INTERNAL FINISHES |
1,700,000.00 |
| 8 |
EXTERNAL FINISHES |
408,000.00 |
| 9 |
FITTING AND FIXTURES (JOINERY) |
272,000.00 |
| 10 |
PROVISIONAL SUM FOR PLUMBING WORKS |
408,000.00 |
| 11 |
PROVISIONAL SUM FOR ELECTRICAL WORKS |
340,000.00 |
| 12 |
PROVISIONAL WORKS AND PRIME COSTS |
544,000.00 |
| TOTAL |
6,800,000.00 |
*Medium assumes construction in a periurban area with moderate labour costs, average finishes and a hybrid contract( part labour)
| LUXURY COST |
| No. |
Description |
Amount (KES) |
| 1 |
SUBSTRUCTURE & GROUND FLOOR SLAB (PROVISIONAL) |
1,700,000.00 |
| 2 |
REINFORCED CONCRETE FRAME |
425,000.00 |
| 3 |
WALLING |
510,000.00 |
| 4 |
ROOF STRUCTURE, COVERING AND RAINWATER DISPOSAL (PROVISIONAL) |
510,000.00 |
| 5 |
WINDOWS |
425,000.00 |
| 6 |
DOORS |
340,000.00 |
| 7 |
INTERNAL FINISHES |
2,125,000.00 |
| 8 |
EXTERNAL FINISHES |
510,000.00 |
| 9 |
FITTING AND FIXTURES (JOINERY) |
340,000.00 |
| 10 |
PROVISIONAL SUM FOR PLUMBING WORKS |
510,000.00 |
| 11 |
PROVISIONAL SUM FOR ELECTRICAL WORKS |
425,000.00 |
| 12 |
PROVISIONAL WORKS AND PRIME COSTS |
680,000.00 |
| TOTAL |
8,500,000.00 |
*Luxury assumes construction in an urban area with high labour costs, high end finishes with a full contract engagement with the contractor