| LOW COST |
| No. |
Description |
Amount (KES) |
| 1 |
SUBSTRUCTURE & GROUND FLOOR SLAB (PROVISIONAL) |
992,000.00 |
| 2 |
REINFORCED CONCRETE FRAME |
248,000.00 |
| 3 |
WALLING |
297,600.00 |
| 4 |
ROOF STRUCTURE, COVERING AND RAINWATER DISPOSAL (PROVISIONAL) |
297,600.00 |
| 5 |
WINDOWS |
248,000.00 |
| 6 |
DOORS |
198,400.00 |
| 7 |
INTERNAL FINISHES |
1,240,000.00 |
| 8 |
EXTERNAL FINISHES |
297,600.00 |
| 9 |
FITTING AND FIXTURES (JOINERY) |
198,400.00 |
| 10 |
PROVISIONAL SUM FOR PLUMBING WORKS |
297,600.00 |
| 11 |
PROVISIONAL SUM FOR ELECTRICAL WORKS |
248,000.00 |
| 12 |
PROVISIONAL WORKS AND PRIME COSTS |
396,800.00 |
| TOTAL |
4,960,000.00 |
*Low Cost assumes construction in rural areas with low labor rates on a labor contract with budget finishes.
| MEDIUM COST |
| No. |
Description |
Amount (KES) |
| 1 |
SUBSTRUCTURE & GROUND FLOOR SLAB (PROVISIONAL) |
1,364,000.00 |
| 2 |
REINFORCED CONCRETE FRAME |
341,000.00 |
| 3 |
WALLING |
409,200.00 |
| 4 |
ROOF STRUCTURE, COVERING AND RAINWATER DISPOSAL (PROVISIONAL) |
409,200.00 |
| 5 |
WINDOWS |
341,000.00 |
| 6 |
DOORS |
272,800.00 |
| 7 |
INTERNAL FINISHES |
1,705,000.00 |
| 8 |
EXTERNAL FINISHES |
409,200.00 |
| 9 |
FITTING AND FIXTURES (JOINERY) |
272,800.00 |
| 10 |
PROVISIONAL SUM FOR PLUMBING WORKS |
409,200.00 |
| 11 |
PROVISIONAL SUM FOR ELECTRICAL WORKS |
341,000.00 |
| 12 |
PROVISIONAL WORKS AND PRIME COSTS |
545,600.00 |
| TOTAL |
6,820,000.00 |
*Medium assumes construction in a periurban area with moderate labour costs, average finishes and a hybrid contract( part labour)
| LUXURY COST |
| No. |
Description |
Amount (KES) |
| 1 |
SUBSTRUCTURE & GROUND FLOOR SLAB (PROVISIONAL) |
1,736,000.00 |
| 2 |
REINFORCED CONCRETE FRAME |
434,000.00 |
| 3 |
WALLING |
520,800.00 |
| 4 |
ROOF STRUCTURE, COVERING AND RAINWATER DISPOSAL (PROVISIONAL) |
520,800.00 |
| 5 |
WINDOWS |
434,000.00 |
| 6 |
DOORS |
347,200.00 |
| 7 |
INTERNAL FINISHES |
2,170,000.00 |
| 8 |
EXTERNAL FINISHES |
520,800.00 |
| 9 |
FITTING AND FIXTURES (JOINERY) |
347,200.00 |
| 10 |
PROVISIONAL SUM FOR PLUMBING WORKS |
520,800.00 |
| 11 |
PROVISIONAL SUM FOR ELECTRICAL WORKS |
434,000.00 |
| 12 |
PROVISIONAL WORKS AND PRIME COSTS |
694,400.00 |
| TOTAL |
8,680,000.00 |
*Luxury assumes construction in an urban area with high labour costs, high end finishes with a full contract engagement with the contractor