PLANNING

ROOF PLAN

GROUND FLOOR

FIRST FLOOR

Share:

Kifaru – 3 Bedroom Bungalow – ID B328

3 Bedrooms

126 sqm

1.5 bathrooms

1/8 acres

15X30meters

Price range: KSh 25,000.00 through KSh 35,000.00

Price range: KSh 25,000.00 through KSh 35,000.00

BUILDING COST ESTIMATES

LOW COST
No. Description Amount (KES)
1 SUBSTRUCTURE & GROUND FLOOR SLAB (PROVISIONAL) 806,400.00
2 REINFORCED CONCRETE FRAME 201,600.00
3 WALLING 241,920.00
4 ROOF STRUCTURE, COVERING AND RAINWATER DISPOSAL (PROVISIONAL) 241,920.00
5 WINDOWS 201,600.00
6 DOORS 161,280.00
7 INTERNAL FINISHES 1,008,000.00
8 EXTERNAL FINISHES 241,920.00
9 FITTING AND FIXTURES (JOINERY) 161,280.00
10 PROVISIONAL SUM FOR PLUMBING WORKS 241,920.00
11 PROVISIONAL SUM FOR ELECTRICAL WORKS 201,600.00
12 PROVISIONAL WORKS AND PRIME COSTS 322,560.00
TOTAL 4,032,000.00

*Low Cost assumes construction in rural areas with low labor rates on a labor contract with budget finishes.

MEDIUM COST
No. Description Amount (KES)
1 SUBSTRUCTURE & GROUND FLOOR SLAB (PROVISIONAL) 1,108,800.00
2 REINFORCED CONCRETE FRAME 277,200.00
3 WALLING 332,640.00
4 ROOF STRUCTURE, COVERING AND RAINWATER DISPOSAL (PROVISIONAL) 332,640.00
5 WINDOWS 277,200.00
6 DOORS 221,760.00
7 INTERNAL FINISHES 1,386,000.00
8 EXTERNAL FINISHES 332,640.00
9 FITTINGS AND FIXTURES (JOINERY) 221,760.00
10 PROVISIONAL SUM FOR PLUMBING WORKS 332,640.00
11 PROVISIONAL SUM FOR ELECTRICAL WORKS 277,200.00
12 PROVISIONAL WORKS AND PRIME COSTS 443,520.00
TOTAL 5,544,000.00

*Medium assumes construction in a periurban area with moderate labour costs, average finishes and a hybrid contract( part labour)

LUXURY COST
No. Description Amount (KES)
1 SUBSTRUCTURE & GROUND FLOOR SLAB (PROVISIONAL) 1,411,200.00
2 REINFORCED CONCRETE FRAME 352,800.00
3 WALLING 423,360.00
4 ROOF STRUCTURE, COVERING AND RAINWATER DISPOSAL (PROVISIONAL) 423,360.00
5 WINDOWS 352,800.00
6 DOORS 282,240.00
7 INTERNAL FINISHES 1,764,000.00
8 EXTERNAL FINISHES 423,360.00
9 FITTINGS AND FIXTURES (JOINERY) 282,240.00
10 PROVISIONAL SUM FOR PLUMBING WORKS 423,360.00
11 PROVISIONAL SUM FOR ELECTRICAL WORKS 352,800.00
12 PROVISIONAL WORKS AND PRIME COSTS 564,480.00
TOTAL 7,056,000.00

*Luxury assumes construction in an urban area with high labour costs, high end finishes with a full contract engagement with the contractor