| LOW COST |
| No. |
Description |
Amount (KES) |
| 1 |
SUBSTRUCTURE & GROUND FLOOR SLAB (PROVISIONAL) |
806,400.00 |
| 2 |
REINFORCED CONCRETE FRAME |
201,600.00 |
| 3 |
WALLING |
241,920.00 |
| 4 |
ROOF STRUCTURE, COVERING AND RAINWATER DISPOSAL (PROVISIONAL) |
241,920.00 |
| 5 |
WINDOWS |
201,600.00 |
| 6 |
DOORS |
161,280.00 |
| 7 |
INTERNAL FINISHES |
1,008,000.00 |
| 8 |
EXTERNAL FINISHES |
241,920.00 |
| 9 |
FITTING AND FIXTURES (JOINERY) |
161,280.00 |
| 10 |
PROVISIONAL SUM FOR PLUMBING WORKS |
241,920.00 |
| 11 |
PROVISIONAL SUM FOR ELECTRICAL WORKS |
201,600.00 |
| 12 |
PROVISIONAL WORKS AND PRIME COSTS |
322,560.00 |
| TOTAL |
4,032,000.00 |
*Low Cost assumes construction in rural areas with low labor rates on a labor contract with budget finishes.
| MEDIUM COST |
| No. |
Description |
Amount (KES) |
| 1 |
SUBSTRUCTURE & GROUND FLOOR SLAB (PROVISIONAL) |
1,108,800.00 |
| 2 |
REINFORCED CONCRETE FRAME |
277,200.00 |
| 3 |
WALLING |
332,640.00 |
| 4 |
ROOF STRUCTURE, COVERING AND RAINWATER DISPOSAL (PROVISIONAL) |
332,640.00 |
| 5 |
WINDOWS |
277,200.00 |
| 6 |
DOORS |
221,760.00 |
| 7 |
INTERNAL FINISHES |
1,386,000.00 |
| 8 |
EXTERNAL FINISHES |
332,640.00 |
| 9 |
FITTINGS AND FIXTURES (JOINERY) |
221,760.00 |
| 10 |
PROVISIONAL SUM FOR PLUMBING WORKS |
332,640.00 |
| 11 |
PROVISIONAL SUM FOR ELECTRICAL WORKS |
277,200.00 |
| 12 |
PROVISIONAL WORKS AND PRIME COSTS |
443,520.00 |
| TOTAL |
5,544,000.00 |
*Medium assumes construction in a periurban area with moderate labour costs, average finishes and a hybrid contract( part labour)
| LUXURY COST |
| No. |
Description |
Amount (KES) |
| 1 |
SUBSTRUCTURE & GROUND FLOOR SLAB (PROVISIONAL) |
1,411,200.00 |
| 2 |
REINFORCED CONCRETE FRAME |
352,800.00 |
| 3 |
WALLING |
423,360.00 |
| 4 |
ROOF STRUCTURE, COVERING AND RAINWATER DISPOSAL (PROVISIONAL) |
423,360.00 |
| 5 |
WINDOWS |
352,800.00 |
| 6 |
DOORS |
282,240.00 |
| 7 |
INTERNAL FINISHES |
1,764,000.00 |
| 8 |
EXTERNAL FINISHES |
423,360.00 |
| 9 |
FITTINGS AND FIXTURES (JOINERY) |
282,240.00 |
| 10 |
PROVISIONAL SUM FOR PLUMBING WORKS |
423,360.00 |
| 11 |
PROVISIONAL SUM FOR ELECTRICAL WORKS |
352,800.00 |
| 12 |
PROVISIONAL WORKS AND PRIME COSTS |
564,480.00 |
| TOTAL |
7,056,000.00 |
*Luxury assumes construction in an urban area with high labour costs, high end finishes with a full contract engagement with the contractor