PLANNING

ROOF PLAN

GROUND FLOOR

FIRST FLOOR

Share:

Nyati – 3 Bedroom Bungalow – ID B332

3 Bedrooms

410 sqm

3.5 bathrooms

1/4 acres

30X30meters

Price range: KSh 25,000.00 through KSh 35,000.00

Price range: KSh 25,000.00 through KSh 35,000.00

BUILDING COST ESTIMATES

LOW COST
No. Description Amount (KES)
1 SUBSTRUCTURE & GROUND FLOOR SLAB (PROVISIONAL) 2,624,000.00
2 REINFORCED CONCRETE FRAME 656,000.00
3 WALLING 787,200.00
4 ROOF STRUCTURE, COVERING AND RAINWATER DISPOSAL (PROVISIONAL) 787,200.00
5 WINDOWS 656,000.00
6 DOORS 524,800.00
7 INTERNAL FINISHES 3,280,000.00
8 EXTERNAL FINISHES 787,200.00
9 FITTING AND FIXTURES (JOINERY) 524,800.00
10 PROVISIONAL SUM FOR PLUMBING WORKS 787,200.00
11 PROVISIONAL SUM FOR ELECTRICAL WORKS 656,000.00
12 PROVISIONAL WORKS AND PRIME COSTS 1,049,600.00
TOTAL 13,120,000.00

*Low Cost assumes construction in rural areas with low labor rates on a labor contract with budget finishes.

MEDIUM COST
No. Description Amount (KES)
1 SUBSTRUCTURE & GROUND FLOOR SLAB (PROVISIONAL) 3,608,000.00
2 REINFORCED CONCRETE FRAME 902,000.00
3 WALLING 1,082,400.00
4 ROOF STRUCTURE, COVERING AND RAINWATER DISPOSAL (PROVISIONAL) 1,082,400.00
5 WINDOWS 902,000.00
6 DOORS 721,600.00
7 INTERNAL FINISHES 4,510,000.00
8 EXTERNAL FINISHES 1,082,400.00
9 FITTING AND FIXTURES (JOINERY) 721,600.00
10 PROVISIONAL SUM FOR PLUMBING WORKS 1,082,400.00
11 PROVISIONAL SUM FOR ELECTRICAL WORKS 902,000.00
12 PROVISIONAL WORKS AND PRIME COSTS 1,443,200.00
TOTAL 18,040,000.00

*Medium assumes construction in a periurban area with moderate labour costs, average finishes and a hybrid contract( part labour)

LUXURY COST
No. Description Amount (KES)
1 SUBSTRUCTURE & GROUND FLOOR SLAB (PROVISIONAL) 4,592,000.00
2 REINFORCED CONCRETE FRAME 1,148,000.00
3 WALLING 1,377,600.00
4 ROOF STRUCTURE, COVERING AND RAINWATER DISPOSAL (PROVISIONAL) 1,377,600.00
5 WINDOWS 1,148,000.00
6 DOORS 918,400.00
7 INTERNAL FINISHES 5,740,000.00
8 EXTERNAL FINISHES 1,377,600.00
9 FITTING AND FIXTURES (JOINERY) 918,400.00
10 PROVISIONAL SUM FOR PLUMBING WORKS 1,377,600.00
11 PROVISIONAL SUM FOR ELECTRICAL WORKS 1,148,000.00
12 PROVISIONAL WORKS AND PRIME COSTS 1,836,800.00
TOTAL 22,960,000.00

*Luxury assumes construction in an urban area with high labour costs, high end finishes with a full contract engagement with the contractor