Duma – 3 Bedroom Bungalow – ID B338

3 Bedrooms

142 sqm

2.0 bathrooms

1/8 acres

15X30meters

Price range: KSh 25,000.00 through KSh 35,000.00

Price range: KSh 25,000.00 through KSh 35,000.00

BUILDING COST ESTIMATES

LOW COST ESTIMATE
No. Description Amount (Ksh)
1 SUBSTRUCTURE & GROUND FLOOR SLAB (PROVISIONAL) 908,800.00
2 REINFORCED CONCRETE FRAME 227,200.00
3 WALLING 272,640.00
4 ROOF STRUCTURE, COVERING AND RAINWATER DISPOSAL (PROVISIONAL) 272,640.00
5 WINDOWS 227,200.00
6 DOORS 181,760.00
7 INTERNAL FINISHES 1,136,000.00
8 EXTERNAL FINISHES 272,640.00
9 FITTING AND FIXTURES (JOINERY) 181,760.00
10 PROVISIONAL SUM FOR PLUMBING WORKS 272,640.00
11 PROVISIONAL SUM FOR ELECTRICAL WORKS 227,200.00
12 PROVISIONAL WORKS AND PRIME COSTS 363,520.00
TOTAL 4,544,000.00

*Low Cost assumes construction in rural areas with low labor rates on a labor contract with budget finishes.

MEDIUM COST ESTIMATE
No. Description Amount (Ksh)
1 SUBSTRUCTURE & GROUND FLOOR SLAB (PROVISIONAL) 1,249,600.00
2 REINFORCED CONCRETE FRAME 312,400.00
3 WALLING 374,880.00
4 ROOF STRUCTURE, COVERING AND RAINWATER DISPOSAL (PROVISIONAL) 374,880.00
5 WINDOWS 312,400.00
6 DOORS 249,920.00
7 INTERNAL FINISHES 1,562,000.00
8 EXTERNAL FINISHES 374,880.00
9 FITTING AND FIXTURES (JOINERY) 249,920.00
10 PROVISIONAL SUM FOR PLUMBING WORKS 374,880.00
11 PROVISIONAL SUM FOR ELECTRICAL WORKS 312,400.00
12 PROVISIONAL WORKS AND PRIME COSTS 499,840.00
TOTAL 6,248,000.00

*Medium assumes construction in a periurban area with moderate labour costs, average finishes and a hybrid contract( part labour)

HIGH COST ESTIMATE
No. Description Amount (Ksh)
1 SUBSTRUCTURE & GROUND FLOOR SLAB (PROVISIONAL) 1,590,400.00
2 REINFORCED CONCRETE FRAME 397,600.00
3 WALLING 477,120.00
4 ROOF STRUCTURE, COVERING AND RAINWATER DISPOSAL (PROVISIONAL) 477,120.00
5 WINDOWS 397,600.00
6 DOORS 318,080.00
7 INTERNAL FINISHES 1,988,000.00
8 EXTERNAL FINISHES 477,120.00
9 FITTING AND FIXTURES (JOINERY) 318,080.00
10 PROVISIONAL SUM FOR PLUMBING WORKS 477,120.00
11 PROVISIONAL SUM FOR ELECTRICAL WORKS 397,600.00
12 PROVISIONAL WORKS AND PRIME COSTS 636,160.00
TOTAL 7,952,000.00

*Luxury assumes construction in an urban area with high labour costs, high end finishes with a full contract engagement with the contractor