Dakar – 4 Bedroom maisonette – ID M412

4 Bedrooms

253 sqm

2.0 bathrooms

1/8 acres

15X30meters

KSh 35,000.00

KSh 35,000.00

BUILDING COST ESTIMATES

LOW COST
No. Description Amount (KES)
1 Substructure & Ground Floor Slab (Provisional) 1,619,200.00
2 Reinforced Concrete Frame 404,800.00
3 Walling 485,760.00
4 Roof Structure, Covering and Rainwater Disposal (Provisional) 485,760.00
5 Windows 404,800.00
6 Doors 323,840.00
7 Internal Finishes 2,024,000.00
8 External Finishes 485,760.00
9 Fitting and Fixtures (Joinery) 323,840.00
10 Provisional Sum for Plumbing Works 485,760.00
11 Provisional Sum for Electrical Works 404,800.00
12 Provisional Works and Prime Costs 647,680.00
TOTAL 8,096,000.00

*Low Cost assumes construction in rural areas with low labor rates on a labor contract with budget finishes.

MEDIUM COST
No. Description Amount (KES)
1 SUBSTRUCTURE & GROUND FLOOR SLAB (PROVISIONAL) 2,226,400.00
2 REINFORCED CONCRETE FRAME 556,600.00
3 WALLING 667,920.00
4 ROOF STRUCTURE, COVERING AND RAINWATER DISPOSAL (PROVISIONAL) 667,920.00
5 WINDOWS 556,600.00
6 DOORS 445,280.00
7 INTERNAL FINISHES 2,783,000.00
8 EXTERNAL FINISHES 667,920.00
9 FITTING AND FIXTURES (JOINERY) 445,280.00
10 PROVISIONAL SUM FOR PLUMBING WORKS 667,920.00
11 PROVISIONAL SUM FOR ELECTRICAL WORKS 556,600.00
12 PROVISIONAL WORKS AND PRIME COSTS 890,560.00
TOTAL 11,132,000.00

*Medium assumes construction in a periurban area with moderate labour costs, average finishes and a hybrid contract( part labour)

 

LUXURY COST
No. Description Amount (KES)
1 SUBSTRUCTURE & GROUND FLOOR SLAB (PROVISIONAL) 2,833,600.00
2 REINFORCED CONCRETE FRAME 708,400.00
3 WALLING 850,080.00
4 ROOF STRUCTURE, COVERING AND RAINWATER DISPOSAL (PROVISIONAL) 850,080.00
5 WINDOWS 708,400.00
6 DOORS 566,720.00
7 INTERNAL FINISHES 3,542,000.00
8 EXTERNAL FINISHES 850,080.00
9 FITTING AND FIXTURES (JOINERY) 566,720.00
10 PROVISIONAL SUM FOR PLUMBING WORKS 850,080.00
11 PROVISIONAL SUM FOR ELECTRICAL WORKS 708,400.00
12 PROVISIONAL WORKS AND PRIME COSTS 1,133,440.00
TOTAL 14,168,000.00

*Luxury assumes construction in an urban area with high labour costs, high end finishes with a full contract engagement with the contractor