PLANNING

ROOF PLAN

GROUND FLOOR

FIRST FLOOR

Share:

Mbuni – 4 Bedroom Bungalow – ID B452

4 Bedrooms

184 sqm

2.0 bathrooms

1/8 acres

15X30meters

KSh 25,000.00

KSh 25,000.00

BUILDING COST ESTIMATES

LOW COST
No. Description Amount (KES)
1 SUBSTRUCTURE & GROUND FLOOR SLAB (PROVISIONAL) 1,177,600.00
2 REINFORCED CONCRETE FRAME 294,400.00
3 WALLING 353,280.00
4 ROOF STRUCTURE, COVERING AND RAINWATER DISPOSAL (PROVISIONAL) 353,280.00
5 WINDOWS 294,400.00
6 DOORS 235,520.00
7 INTERNAL FINISHES 1,472,000.00
8 EXTERNAL FINISHES 353,280.00
9 FITTING AND FIXTURES (JOINERY) 235,520.00
10 PROVISIONAL SUM FOR PLUMBING WORKS 353,280.00
11 PROVISIONAL SUM FOR ELECTRICAL WORKS 294,400.00
12 PROVISIONAL WORKS AND PRIME COSTS 471,040.00
TOTAL 5,888,000.00

*Low Cost assumes construction in rural areas with low labor rates on a labor contract with budget finishes.

MEDIUM COST
No. Description Amount (KES)
1 SUBSTRUCTURE & GROUND FLOOR SLAB (PROVISIONAL) 1,619,200.00
2 REINFORCED CONCRETE FRAME 404,800.00
3 WALLING 485,760.00
4 ROOF STRUCTURE, COVERING AND RAINWATER DISPOSAL (PROVISIONAL) 485,760.00
5 WINDOWS 404,800.00
6 DOORS 323,840.00
7 INTERNAL FINISHES 2,024,000.00
8 EXTERNAL FINISHES 485,760.00
9 FITTING AND FIXTURES (JOINERY) 323,840.00
10 PROVISIONAL SUM FOR PLUMBING WORKS 485,760.00
11 PROVISIONAL SUM FOR ELECTRICAL WORKS 404,800.00
12 PROVISIONAL WORKS AND PRIME COSTS 647,680.00
TOTAL 8,096,000.00

*Medium assumes construction in a periurban area with moderate labour costs, average finishes and a hybrid contract( part labour)

LUXURY COST
No. Description Amount (KES)
1 SUBSTRUCTURE & GROUND FLOOR SLAB (PROVISIONAL) 2,060,800.00
2 REINFORCED CONCRETE FRAME 515,200.00
3 WALLING 618,240.00
4 ROOF STRUCTURE, COVERING AND RAINWATER DISPOSAL (PROVISIONAL) 618,240.00
5 WINDOWS 515,200.00
6 DOORS 412,160.00
7 INTERNAL FINISHES 2,576,000.00
8 EXTERNAL FINISHES 618,240.00
9 FITTING AND FIXTURES (JOINERY) 412,160.00
10 PROVISIONAL SUM FOR PLUMBING WORKS 618,240.00
11 PROVISIONAL SUM FOR ELECTRICAL WORKS 515,200.00
12 PROVISIONAL WORKS AND PRIME COSTS 824,320.00
TOTAL 10,304,000.00

*Luxury assumes construction in an urban area with high labour costs, high end finishes with a full contract engagement with the contractor