BUILDING COST ESTIMATES

LOW COST
No. DESCRIPTION AMOUNT (KES)
1 SUBSTRUCTURE & GROUND FLOOR SLAB (PROVISIONAL) 1,446,400.00
2 REINFORCED CONCRETE FRAME 361,600.00
3 WALLING 433,920.00
4 ROOF STRUCTURE, COVERING AND RAINWATER DISPOSAL (PROVISIONAL) 433,920.00
5 WINDOWS 361,600.00
6 DOORS 289,280.00
7 INTERNAL FINISHES 1,808,000.00
8 EXTERNAL FINISHES 433,920.00
9 FITTING AND FIXTURES (JOINERY) 289,280.00
10 PROVISIONAL SUM FOR PLUMBING WORKS 433,920.00
11 PROVISIONAL SUM FOR ELECTRICAL WORKS 361,600.00
12 PROVISIONAL WORKS AND PRIME COSTS 578,560.00
TOTAL 7,232,000.00

*Low Cost assumes construction in rural areas with low labor rates on a labor contract with budget finishes.

MEDIUM COST
No. DESCRIPTION AMOUNT (KES)
1 SUBSTRUCTURE & GROUND FLOOR SLAB (PROVISIONAL) 1,988,800.00
2 REINFORCED CONCRETE FRAME 497,200.00
3 WALLING 596,640.00
4 ROOF STRUCTURE, COVERING AND RAINWATER DISPOSAL (PROVISIONAL) 596,640.00
5 WINDOWS 497,200.00
6 DOORS 397,760.00
7 INTERNAL FINISHES 2,486,000.00
8 EXTERNAL FINISHES 596,640.00
9 FITTING AND FIXTURES (JOINERY) 397,760.00
10 PROVISIONAL SUM FOR PLUMBING WORKS 596,640.00
11 PROVISIONAL SUM FOR ELECTRICAL WORKS 497,200.00
12 PROVISIONAL WORKS AND PRIME COSTS 795,520.00
TOTAL 9,944,000.00

*Medium assumes construction in a periurban area with moderate labour costs, average finishes and a hybrid contract( part labour)

LUXURY COST
No. DESCRIPTION AMOUNT (KES)
1 SUBSTRUCTURE & GROUND FLOOR SLAB (PROVISIONAL) 2,531,200.00
2 REINFORCED CONCRETE FRAME 632,800.00
3 WALLING 759,360.00
4 ROOF STRUCTURE, COVERING AND RAINWATER DISPOSAL (PROVISIONAL) 759,360.00
5 WINDOWS 632,800.00
6 DOORS 506,240.00
7 INTERNAL FINISHES 3,164,000.00
8 EXTERNAL FINISHES 759,360.00
9 FITTING AND FIXTURES (JOINERY) 506,240.00
10 PROVISIONAL SUM FOR PLUMBING WORKS 759,360.00
11 PROVISIONAL SUM FOR ELECTRICAL WORKS 632,800.00
12 PROVISIONAL WORKS AND PRIME COSTS 1,012,480.00
TOTAL 12,656,000.00

*Luxury assumes construction in an urban area with high labour costs, high end finishes with a full contract engagement with the contractor