PLANNING

ROOF PLAN

GROUND FLOOR

FIRST FLOOR

Share:

Maasai – 4 Bedroom +dsq Villa – ID V449

4 Bedrooms

300 sqm

5.5 bathrooms

1/4 acres

30X30meters

Price range: KSh 45,000.00 through KSh 55,000.00

Price range: KSh 45,000.00 through KSh 55,000.00

BUILDING COST ESTIMATES

LOW COST
No. Description Amount (KES)
1 Substructure & Ground Floor Slab (Provisional) 1,920,000.00
2 Reinforced Concrete Frame 480,000.00
3 Walling 576,000.00
4 Roof Structure, Covering and Rainwater Disposal (Provisional) 576,000.00
5 Windows 480,000.00
6 Doors 384,000.00
7 Internal Finishes 2,400,000.00
8 External Finishes 576,000.00
9 Fitting and Fixtures (Joinery) 384,000.00
10 Provisional Sum for Plumbing Works 576,000.00
11 Provisional Sum for Electrical Works 480,000.00
12 Provisional Works and Prime Costs 768,000.00
TOTAL 9,600,000.00

*Low Cost assumes construction in rural areas with low labor rates on a labor contract with budget finishes.

MEDIUM COST
No. Description Amount (KES)
1 Substructure & Ground Floor Slab (Provisional) 2,640,000.00
2 Reinforced Concrete Frame 660,000.00
3 Walling 792,000.00
4 Roof Structure, Covering and Rainwater Disposal (Provisional) 792,000.00
5 Windows 660,000.00
6 Doors 528,000.00
7 Internal Finishes 3,300,000.00
8 External Finishes 792,000.00
9 Fitting and Fixtures (Joinery) 528,000.00
10 Provisional Sum for Plumbing Works 792,000.00
11 Provisional Sum for Electrical Works 660,000.00
12 Provisional Works and Prime Costs 1,056,000.00
TOTAL 13,200,000.00

*Medium assumes construction in a periurban area with moderate labour costs, average finishes and a hybrid contract( part labour)

LUXURY COST
No. Description Amount (KES)
1 Substructure & Ground Floor Slab (Provisional) 3,360,000.00
2 Reinforced Concrete Frame 840,000.00
3 Walling 1,008,000.00
4 Roof Structure, Covering and Rainwater Disposal (Provisional) 1,008,000.00
5 Windows 840,000.00
6 Doors 672,000.00
7 Internal Finishes 4,200,000.00
8 External Finishes 1,008,000.00
9 Fitting and Fixtures (Joinery) 672,000.00
10 Provisional Sum for Plumbing Works 1,008,000.00
11 Provisional Sum for Electrical Works 840,000.00
12 Provisional Works and Prime Costs 1,344,000.00
TOTAL 16,800,000.00

*Luxury assumes construction in an urban area with high labour costs, high end finishes with a full contract engagement with the contractor