Capetown – 4 Bedroom maisonette – ID M414

4 Bedrooms

318 sqm

4.5 bathrooms

1/8 acres

15X30meters

Price range: KSh 35,000.00 through KSh 55,000.00

Price range: KSh 35,000.00 through KSh 55,000.00

BUILDING COST ESTIMATES

NO. DESCRIPTION AMOUNT (Ksh)
1 SUBSTRUCTURE & GROUND FLOOR SLAB (PROVISIONAL) 2,041,600.00
2 REINFORCED CONCRETE FRAME 510,400.00
3 WALLING 612,480.00
4 ROOF STRUCTURE, COVERING AND RAINWATER DISPOSAL (PROVISIONAL) 612,480.00
5 WINDOWS 510,400.00
6 DOORS 408,320.00
7 INTERNAL FINISHES 2,552,000.00
8 EXTERNAL FINISHES 612,480.00
9 FITTING AND FIXTURES (JOINERY) 408,320.00
10 PROVISIONAL SUM FOR PLUMBING WORKS 612,480.00
11 PROVISIONAL SUM FOR ELECTRICAL WORKS 510,400.00
12 PROVISIONAL WORKS AND PRIME COSTS 816,640.00
TOTAL 10,208,000.00

*Low Cost assumes construction in rural areas with low labor rates on a labor contract with budget finishes.

NO. DESCRIPTION AMOUNT (Ksh)
1 SUBSTRUCTURE & GROUND FLOOR SLAB (PROVISIONAL) 2,807,200.00
2 REINFORCED CONCRETE FRAME 701,800.00
3 WALLING 842,160.00
4 ROOF STRUCTURE, COVERING AND RAINWATER DISPOSAL (PROVISIONAL) 842,160.00
5 WINDOWS 701,800.00
6 DOORS 561,440.00
7 INTERNAL FINISHES 3,509,000.00
8 EXTERNAL FINISHES 842,160.00
9 FITTING AND FIXTURES (JOINERY) 561,440.00
10 PROVISIONAL SUM FOR PLUMBING WORKS 842,160.00
11 PROVISIONAL SUM FOR ELECTRICAL WORKS 701,800.00
12 PROVISIONAL WORKS AND PRIME COSTS 1,122,880.00
TOTAL 14,036,000.00

*Medium assumes construction in a periurban area with moderate labour costs, average finishes and a hybrid contract( part labour)

NO. DESCRIPTION AMOUNT (Ksh)
1 SUBSTRUCTURE & GROUND FLOOR SLAB (PROVISIONAL) 3,572,800.00
2 REINFORCED CONCRETE FRAME 893,200.00
3 WALLING 1,071,840.00
4 ROOF STRUCTURE, COVERING AND RAINWATER DISPOSAL (PROVISIONAL) 1,071,840.00
5 WINDOWS 893,200.00
6 DOORS 714,560.00
7 INTERNAL FINISHES 4,466,000.00
8 EXTERNAL FINISHES 1,071,840.00
9 FITTING AND FIXTURES (JOINERY) 714,560.00
10 PROVISIONAL SUM FOR PLUMBING WORKS 1,071,840.00
11 PROVISIONAL SUM FOR ELECTRICAL WORKS 893,200.00
12 PROVISIONAL WORKS AND PRIME COSTS 1,429,120.00
TOTAL 17,864,000.00

*Luxury assumes construction in an urban area with high labour costs, high end finishes with a full contract engagement with the contractor