Abijan – 3 Bedroom +dsq maisonette – ID M326

3 Bedrooms

219 sqm

4.5 bathrooms

1/8 acres

15X30meters

Price range: KSh 35,000.00 through KSh 45,000.00

Price range: KSh 35,000.00 through KSh 45,000.00

BUILDING COST ESTIMATES

 

LOW COST
No. Description Amount (KES)
1 SUBSTRUCTURE & GROUND FLOOR SLAB (PROVISIONAL) 1,401,600.00
2 REINFORCED CONCRETE FRAME 350,400.00
3 WALLING 420,480.00
4 ROOF STRUCTURE, COVERING AND RAINWATER DISPOSAL (PROVISIONAL) 420,480.00
5 WINDOWS 350,400.00
6 DOORS 280,320.00
7 INTERNAL FINISHES 1,752,000.00
8 EXTERNAL FINISHES 420,480.00
9 FITTING AND FIXTURES (JOINERY) 280,320.00
10 PROVISIONAL SUM FOR PLUMBING WORKS 420,480.00
11 PROVISIONAL SUM FOR ELECTRICAL WORKS 350,400.00
12 PROVISIONAL WORKS AND PRIME COSTS 560,640.00
TOTAL 7,008,000.00

*Low Cost assumes construction in rural areas with low labor rates on a labor contract with budget finishes.

MEDIUM COST
No. Description Amount (KES)
1 SUBSTRUCTURE & GROUND FLOOR SLAB (PROVISIONAL) 1,927,200.00
2 REINFORCED CONCRETE FRAME 481,800.00
3 WALLING 578,160.00
4 ROOF STRUCTURE, COVERING AND RAINWATER DISPOSAL (PROVISIONAL) 578,160.00
5 WINDOWS 481,800.00
6 DOORS 385,440.00
7 INTERNAL FINISHES 2,409,000.00
8 EXTERNAL FINISHES 578,160.00
9 FITTING AND FIXTURES (JOINERY) 385,440.00
10 PROVISIONAL SUM FOR PLUMBING WORKS 578,160.00
11 PROVISIONAL SUM FOR ELECTRICAL WORKS 481,800.00
12 PROVISIONAL WORKS AND PRIME COSTS 770,880.00
TOTAL 9,636,000.00

*Medium assumes construction in a periurban area with moderate labour costs, average finishes and a hybrid contract( part labour)

HIGH COST
No. Description Amount (KES)
1 SUBSTRUCTURE & GROUND FLOOR SLAB (PROVISIONAL) 2,452,800.00
2 REINFORCED CONCRETE FRAME 613,200.00
3 WALLING 735,840.00
4 ROOF STRUCTURE, COVERING AND RAINWATER DISPOSAL (PROVISIONAL) 735,840.00
5 WINDOWS 613,200.00
6 DOORS 490,560.00
7 INTERNAL FINISHES 3,066,000.00
8 EXTERNAL FINISHES 735,840.00
9 FITTING AND FIXTURES (JOINERY) 490,560.00
10 PROVISIONAL SUM FOR PLUMBING WORKS 735,840.00
11 PROVISIONAL SUM FOR ELECTRICAL WORKS 613,200.00
12 PROVISIONAL WORKS AND PRIME COSTS 981,120.00
TOTAL 12,264,000.00

*Luxury assumes construction in an urban area with high labour costs, high end finishes with a full contract engagement with the contractor