Bamako – 4 Bedroom+dsq maisonette– ID M446

4 Bedrooms

188 sqm

4.5 bathrooms

1/8 acres

15X30meters

Price range: KSh 35,000.00 through KSh 45,000.00

Price range: KSh 35,000.00 through KSh 45,000.00

BUILDING COST ESTIMATES

LOW COST
No. Description Amount (KES)
1 SUBSTRUCTURE & GROUND FLOOR SLAB (PROVISIONAL) 1,203,200.00
2 REINFORCED CONCRETE FRAME 300,800.00
3 WALLING 360,960.00
4 ROOF STRUCTURE, COVERING AND RAINWATER DISPOSAL (PROVISIONAL) 360,960.00
5 WINDOWS 300,800.00
6 DOORS 240,640.00
7 INTERNAL FINISHES 1,504,000.00
8 EXTERNAL FINISHES 360,960.00
9 FITTING AND FIXTURES (JOINERY) 240,640.00
10 PROVISIONAL SUM FOR PLUMBING WORKS 360,960.00
11 PROVISIONAL SUM FOR ELECTRICAL WORKS 300,800.00
12 PROVISIONAL WORKS AND PRIME COSTS 481,280.00
TOTAL 6,016,000.00

*Low Cost assumes construction in rural areas with low labor rates on a labor contract with budget finishes.

MEDIUM COST
No. Description Amount (KES)
1 SUBSTRUCTURE & GROUND FLOOR SLAB (PROVISIONAL) 1,654,400.00
2 REINFORCED CONCRETE FRAME 413,600.00
3 WALLING 496,320.00
4 ROOF STRUCTURE, COVERING AND RAINWATER DISPOSAL (PROVISIONAL) 496,320.00
5 WINDOWS 413,600.00
6 DOORS 330,880.00
7 INTERNAL FINISHES 2,068,000.00
8 EXTERNAL FINISHES 496,320.00
9 FITTING AND FIXTURES (JOINERY) 330,880.00
10 PROVISIONAL SUM FOR PLUMBING WORKS 496,320.00
11 PROVISIONAL SUM FOR ELECTRICAL WORKS 413,600.00
12 PROVISIONAL WORKS AND PRIME COSTS 661,760.00
TOTAL 8,272,000.00

*Medium assumes construction in a periurban area with moderate labour costs, average finishes and a hybrid contract( part labour)

HIGH COST
No. Description Amount (KES)
1 SUBSTRUCTURE & GROUND FLOOR SLAB (PROVISIONAL) 2,105,600.00
2 REINFORCED CONCRETE FRAME 526,400.00
3 WALLING 631,680.00
4 ROOF STRUCTURE, COVERING AND RAINWATER DISPOSAL (PROVISIONAL) 631,680.00
5 WINDOWS 526,400.00
6 DOORS 421,120.00
7 INTERNAL FINISHES 2,632,000.00
8 EXTERNAL FINISHES 631,680.00
9 FITTING AND FIXTURES (JOINERY) 421,120.00
10 PROVISIONAL SUM FOR PLUMBING WORKS 631,680.00
11 PROVISIONAL SUM FOR ELECTRICAL WORKS 526,400.00
12 PROVISIONAL WORKS AND PRIME COSTS 842,240.00
TOTAL 10,528,000.00

*Luxury assumes construction in an urban area with high labour costs, high end finishes with a full contract engagement with the contractor