PLANNING

ROOF PLAN

GROUND FLOOR

FIRST FLOOR

Share:

Pretoria – 4 Bedroom + dsq maisonette– ID M447

4 Bedrooms

298 sqm

5.5 bathrooms

1/4 acres

30X30meters

KSh 35,000.00

KSh 35,000.00

BUILDING COST ESTIMATES

LOW COST
No. Description Amount (KES)
1 SUBSTRUCTURE & GROUND FLOOR SLAB (PROVISIONAL) 1,907,200.00
2 REINFORCED CONCRETE FRAME 476,800.00
3 WALLING 572,160.00
4 ROOF STRUCTURE, COVERING AND RAINWATER DISPOSAL (PROVISIONAL) 572,160.00
5 WINDOWS 476,800.00
6 DOORS 381,440.00
7 INTERNAL FINISHES 2,384,000.00
8 EXTERNAL FINISHES 572,160.00
9 FITTING AND FIXTURES (JOINERY) 381,440.00
10 PROVISIONAL SUM FOR PLUMBING WORKS 572,160.00
11 PROVISIONAL SUM FOR ELECTRICAL WORKS 476,800.00
12 PROVISIONAL WORKS AND PRIME COSTS 762,880.00
TOTAL 9,536,000.00

*Low Cost assumes construction in rural areas with low labor rates on a labor contract with budget finishes.

MEDIUM COST
No. Description Amount (KES)
1 SUBSTRUCTURE & GROUND FLOOR SLAB (PROVISIONAL) 2,622,400.00
2 REINFORCED CONCRETE FRAME 655,600.00
3 WALLING 786,720.00
4 ROOF STRUCTURE, COVERING AND RAINWATER DISPOSAL (PROVISIONAL) 786,720.00
5 WINDOWS 655,600.00
6 DOORS 524,480.00
7 INTERNAL FINISHES 3,278,000.00
8 EXTERNAL FINISHES 786,720.00
9 FITTING AND FIXTURES (JOINERY) 524,480.00
10 PROVISIONAL SUM FOR PLUMBING WORKS 786,720.00
11 PROVISIONAL SUM FOR ELECTRICAL WORKS 655,600.00
12 PROVISIONAL WORKS AND PRIME COSTS 1,048,960.00
TOTAL 13,112,000.00

*Medium assumes construction in a periurban area with moderate labour costs, average finishes and a hybrid contract( part labour)

HIGH COST
No. Description Amount (KES)
1 SUBSTRUCTURE & GROUND FLOOR SLAB (PROVISIONAL) 3,337,600.00
2 REINFORCED CONCRETE FRAME 834,400.00
3 WALLING 1,001,280.00
4 ROOF STRUCTURE, COVERING AND RAINWATER DISPOSAL (PROVISIONAL) 1,001,280.00
5 WINDOWS 834,400.00
6 DOORS 667,520.00
7 INTERNAL FINISHES 4,172,000.00
8 EXTERNAL FINISHES 1,001,280.00
9 FITTING AND FIXTURES (JOINERY) 667,520.00
10 PROVISIONAL SUM FOR PLUMBING WORKS 1,001,280.00
11 PROVISIONAL SUM FOR ELECTRICAL WORKS 834,400.00
12 PROVISIONAL WORKS AND PRIME COSTS 1,335,040.00
TOTAL 16,688,000.00

*Luxury assumes construction in an urban area with high labour costs, high end finishes with a full contract engagement with the contractor