Arusha – 4 Bedroom +dsq maisonette– ID M448

4 Bedrooms

403 sqm

3.0 bathrooms

1/8 acres

15X30meters

KSh 35,000.00

KSh 35,000.00

BUILDING COST ESTIMATES

LOW COST
No. Description Amount (KES)
1 SUBSTRUCTURE & GROUND FLOOR SLAB (PROVISIONAL) 2,579,200.00
2 REINFORCED CONCRETE FRAME 644,800.00
3 WALLING 773,760.00
4 ROOF STRUCTURE, COVERING AND RAINWATER DISPOSAL (PROVISIONAL) 773,760.00
5 WINDOWS 644,800.00
6 DOORS 515,840.00
7 INTERNAL FINISHES 3,224,000.00
8 EXTERNAL FINISHES 773,760.00
9 FITTING AND FIXTURES (JOINERY) 515,840.00
10 PROVISIONAL SUM FOR PLUMBING WORKS 773,760.00
11 PROVISIONAL SUM FOR ELECTRICAL WORKS 644,800.00
12 PROVISIONAL WORKS AND PRIME COSTS 1,031,680.00
TOTAL 12,896,000.00

*Low Cost assumes construction in rural areas with low labor rates on a labor contract with budget finishes.

MEDIUM COST
No. Description Amount (KES)
1 SUBSTRUCTURE & GROUND FLOOR SLAB (PROVISIONAL) 3,546,400.00
2 REINFORCED CONCRETE FRAME 886,600.00
3 WALLING 1,063,920.00
4 ROOF STRUCTURE, COVERING AND RAINWATER DISPOSAL (PROVISIONAL) 1,063,920.00
5 WINDOWS 886,600.00
6 DOORS 709,280.00
7 INTERNAL FINISHES 4,433,000.00
8 EXTERNAL FINISHES 1,063,920.00
9 FITTING AND FIXTURES (JOINERY) 709,280.00
10 PROVISIONAL SUM FOR PLUMBING WORKS 1,063,920.00
11 PROVISIONAL SUM FOR ELECTRICAL WORKS 886,600.00
12 PROVISIONAL WORKS AND PRIME COSTS 1,418,560.00
TOTAL 17,732,000.00

*Medium assumes construction in a periurban area with moderate labour costs, average finishes and a hybrid contract( part labour)

HIGH COST
No. Description Amount (KES)
1 SUBSTRUCTURE & GROUND FLOOR SLAB (PROVISIONAL) 4,513,600.00
2 REINFORCED CONCRETE FRAME 1,128,400.00
3 WALLING 1,354,080.00
4 ROOF STRUCTURE, COVERING AND RAINWATER DISPOSAL (PROVISIONAL) 1,354,080.00
5 WINDOWS 1,128,400.00
6 DOORS 902,720.00
7 INTERNAL FINISHES 5,642,000.00
8 EXTERNAL FINISHES 1,354,080.00
9 FITTING AND FIXTURES (JOINERY) 902,720.00
10 PROVISIONAL SUM FOR PLUMBING WORKS 1,354,080.00
11 PROVISIONAL SUM FOR ELECTRICAL WORKS 1,128,400.00
12 PROVISIONAL WORKS AND PRIME COSTS 1,805,440.00
TOTAL 22,568,000.00

*Luxury assumes construction in an urban area with high labour costs, high end finishes with a full contract engagement with the contractor