| MEDIUM COST |
| No. |
Description |
Amount (Ksh) |
| 1 |
Substructure & Ground Floor Slab (Provisional) |
1,612,800.00 |
| 2 |
Reinforced Concrete Frame |
403,200.00 |
| 3 |
Walling |
483,840.00 |
| 4 |
Roof Structure, Covering and Rainwater Disposal (Provisional) |
483,840.00 |
| 5 |
Windows |
403,200.00 |
| 6 |
Doors |
322,560.00 |
| 7 |
Internal Finishes |
2,016,000.00 |
| 8 |
External Finishes |
483,840.00 |
| 9 |
Fitting and Fixtures (Joinery) |
322,560.00 |
| 10 |
Provisional Sum for Plumbing Works |
483,840.00 |
| 11 |
Provisional Sum for Electrical Works |
403,200.00 |
| 12 |
Provisional Works and Prime Costs |
645,120.00 |
| TOTAL |
8,064,000.00 |
*Low Cost assumes construction in rural areas with low labor rates on a labor contract with budget finishes.
| MEDIUM COST |
| No. |
Description |
Amount (Ksh) |
| 1 |
Substructure & Ground Floor Slab (Provisional) |
2,217,600.00 |
| 2 |
Reinforced Concrete Frame |
554,400.00 |
| 3 |
Walling |
665,280.00 |
| 4 |
Roof Structure, Covering and Rainwater Disposal (Provisional) |
665,280.00 |
| 5 |
Windows |
554,400.00 |
| 6 |
Doors |
443,520.00 |
| 7 |
Internal Finishes |
2,772,000.00 |
| 8 |
External Finishes |
665,280.00 |
| 9 |
Fitting and Fixtures (Joinery) |
443,520.00 |
| 10 |
Provisional Sum for Plumbing Works |
665,280.00 |
| 11 |
Provisional Sum for Electrical Works |
554,400.00 |
| 12 |
Provisional Works and Prime Costs |
887,040.00 |
| TOTAL |
11,088,000.00 |
*Medium assumes construction in a periurban area with moderate labour costs, average finishes and a hybrid contract( part labour)
| LUXURY COST |
| No. |
Description |
Amount (Ksh) |
| 1 |
Substructure & Ground Floor Slab (Provisional) |
2,822,400.00 |
| 2 |
Reinforced Concrete Frame |
705,600.00 |
| 3 |
Walling |
846,720.00 |
| 4 |
Roof Structure, Covering and Rainwater Disposal (Provisional) |
846,720.00 |
| 5 |
Windows |
705,600.00 |
| 6 |
Doors |
564,480.00 |
| 7 |
Internal Finishes |
3,528,000.00 |
| 8 |
External Finishes |
846,720.00 |
| 9 |
Fitting and Fixtures (Joinery) |
564,480.00 |
| 10 |
Provisional Sum for Plumbing Works |
846,720.00 |
| 11 |
Provisional Sum for Electrical Works |
705,600.00 |
| 12 |
Provisional Works and Prime Costs |
1,128,960.00 |
| TOTAL |
14,112,000.00 |
*Luxury assumes construction in an urban area with high labour costs, high end finishes with a full contract engagement with the contractor