BUILDING COST ESTIMATES

LOW COST
No. Description Amount (KES)
1 SUBSTRUCTURE & GROUND FLOOR SLAB (PROVISIONAL) 1,568,000.00
2 REINFORCED CONCRETE FRAME 392,000.00
3 WALLING 470,400.00
4 ROOF STRUCTURE, COVERING AND RAINWATER DISPOSAL (PROVISIONAL) 470,400.00
5 WINDOWS 392,000.00
6 DOORS 313,600.00
7 INTERNAL FINISHES 1,960,000.00
8 EXTERNAL FINISHES 470,400.00
9 FITTING AND FIXTURES (JOINERY) 313,600.00
10 PROVISIONAL SUM FOR PLUMBING WORKS 470,400.00
11 PROVISIONAL SUM FOR ELECTRICAL WORKS 392,000.00
12 PROVISIONAL WORKS AND PRIME COSTS 627,200.00
TOTAL 7,840,000.00

*Low Cost assumes construction in rural areas with low labor rates on a labor contract with budget finishes.

LOW COST
No. Description Amount (KES)
1 SUBSTRUCTURE & GROUND FLOOR SLAB (PROVISIONAL) 2,156,000.00
2 REINFORCED CONCRETE FRAME 539,000.00
3 WALLING 646,800.00
4 ROOF STRUCTURE, COVERING AND RAINWATER DISPOSAL (PROVISIONAL) 646,800.00
5 WINDOWS 539,000.00
6 DOORS 431,200.00
7 INTERNAL FINISHES 2,695,000.00
8 EXTERNAL FINISHES 646,800.00
9 FITTING AND FIXTURES (JOINERY) 431,200.00
10 PROVISIONAL SUM FOR PLUMBING WORKS 646,800.00
11 PROVISIONAL SUM FOR ELECTRICAL WORKS 539,000.00
12 PROVISIONAL WORKS AND PRIME COSTS 862,400.00
TOTAL 10,780,000.00

*Medium assumes construction in a periurban area with moderate labour costs, average finishes and a hybrid contract( part labour)

MEDIUM COST
No. Description Amount (KES)
1 SUBSTRUCTURE & GROUND FLOOR SLAB (PROVISIONAL) 2,744,000.00
2 REINFORCED CONCRETE FRAME 686,000.00
3 WALLING 823,200.00
4 ROOF STRUCTURE, COVERING AND RAINWATER DISPOSAL (PROVISIONAL) 823,200.00
5 WINDOWS 686,000.00
6 DOORS 548,800.00
7 INTERNAL FINISHES 3,430,000.00
8 EXTERNAL FINISHES 823,200.00
9 FITTING AND FIXTURES (JOINERY) 548,800.00
10 PROVISIONAL SUM FOR PLUMBING WORKS 823,200.00
11 PROVISIONAL SUM FOR ELECTRICAL WORKS 686,000.00
12 PROVISIONAL WORKS AND PRIME COSTS 1,097,600.00
TOTAL 13,720,000.00

*Luxury assumes construction in an urban area with high labour costs, high end finishes with a full contract engagement with the contractor