BUILDING COST ESTIMATES

LOW COST
No. Description Amount (KES)
1 SUBSTRUCTURE & GROUND FLOOR SLAB (PROVISIONAL) 819,200.00
2 REINFORCED CONCRETE FRAME 204,800.00
3 WALLING 245,760.00
4 ROOF STRUCTURE, COVERING AND RAINWATER DISPOSAL (PROVISIONAL) 245,760.00
5 WINDOWS 204,800.00
6 DOORS 163,840.00
7 INTERNAL FINISHES 1,024,000.00
8 EXTERNAL FINISHES 245,760.00
9 FITTINGS AND FIXTURES (JOINERY) 163,840.00
10 PROVISIONAL SUM FOR PLUMBING WORKS 245,760.00
11 PROVISIONAL SUM FOR ELECTRICAL WORKS 204,800.00
12 PROVISIONAL WORKS AND PRIME COSTS 327,680.00
TOTAL 4,096,000.00

*Low Cost assumes construction in rural areas with low labor rates on a labor contract with budget finishes.

MEDIUM COST
No. Description Amount (KES)
1 SUBSTRUCTURE & GROUND FLOOR SLAB (PROVISIONAL) 1,126,400.00
2 REINFORCED CONCRETE FRAME 281,600.00
3 WALLING 337,920.00
4 ROOF STRUCTURE, COVERING AND RAINWATER DISPOSAL (PROVISIONAL) 337,920.00
5 WINDOWS 281,600.00
6 DOORS 225,280.00
7 INTERNAL FINISHES 1,408,000.00
8 EXTERNAL FINISHES 337,920.00
9 FITTING AND FIXTURES (JOINERY) 225,280.00
10 PROVISIONAL SUM FOR PLUMBING WORKS 337,920.00
11 PROVISIONAL SUM FOR ELECTRICAL WORKS 281,600.00
12 PROVISIONAL WORKS AND PRIME COSTS 450,560.00
TOTAL 5,632,000.00

*Medium assumes construction in a periurban area with moderate labour costs, average finishes and a hybrid contract( part labour)

LUXURY COST
No. Description Amount (KES)
1 SUBSTRUCTURE & GROUND FLOOR SLAB (PROVISIONAL) 1,433,600.00
2 REINFORCED CONCRETE FRAME 358,400.00
3 WALLING 430,080.00
4 ROOF STRUCTURE, COVERING AND RAINWATER DISPOSAL (PROVISIONAL) 430,080.00
5 WINDOWS 358,400.00
6 DOORS 286,720.00
7 INTERNAL FINISHES 1,792,000.00
8 EXTERNAL FINISHES 430,080.00
9 FITTING AND FIXTURES (JOINERY) 286,720.00
10 PROVISIONAL SUM FOR PLUMBING WORKS 430,080.00
11 PROVISIONAL SUM FOR ELECTRICAL WORKS 358,400.00
12 PROVISIONAL WORKS AND PRIME COSTS 573,440.00
TOTAL 7,168,000.00

*Luxury assumes construction in an urban area with high labour costs, high end finishes with a full contract engagement with the contractor