Johannesburg – 3 Bedroom maisonette – ID M319

3 Bedrooms

234 sqm

3.0 bathrooms

1/4 acres

30X30meters

Price range: KSh 35,000.00 through KSh 45,000.00

Price range: KSh 35,000.00 through KSh 45,000.00

BUILDING COST ESTIMATES

 

LOW COST
No. DESCRIPTION AMOUNT (Ksh)
1 SUBSTRUCTURE & GROUND FLOOR SLAB (PROVISIONAL) 1,497,600.00
2 REINFORCED CONCRETE FRAME 374,400.00
3 WALLING 449,280.00
4 ROOF STRUCTURE, COVERING AND RAINWATER DISPOSAL (PROVISIONAL) 449,280.00
5 WINDOWS 374,400.00
6 DOORS 299,520.00
7 INTERNAL FINISHES 1,872,000.00
8 EXTERNAL FINISHES 449,280.00
9 FITTING AND FIXTURES (JOINERY) 299,520.00
10 PROVISIONAL SUM FOR PLUMBING WORKS 449,280.00
11 PROVISIONAL SUM FOR ELECTRICAL WORKS 374,400.00
12 PROVISIONAL WORKS AND PRIME COSTS 599,040.00
TOTAL 7,488,000.00

*Low Cost assumes construction in rural areas with low labor rates on a labor contract with budget finishes.

 

 

MEDIUM COST
No. DESCRIPTION AMOUNT (Ksh)
1 SUBSTRUCTURE & GROUND FLOOR SLAB (PROVISIONAL) 2,059,200.00
2 REINFORCED CONCRETE FRAME 514,800.00
3 WALLING 617,760.00
4 ROOF STRUCTURE, COVERING AND RAINWATER DISPOSAL (PROVISIONAL) 617,760.00
5 WINDOWS 514,800.00
6 DOORS 411,840.00
7 INTERNAL FINISHES 2,574,000.00
8 EXTERNAL FINISHES 617,760.00
9 FITTING AND FIXTURES (JOINERY) 411,840.00
10 PROVISIONAL SUM FOR PLUMBING WORKS 617,760.00
11 PROVISIONAL SUM FOR ELECTRICAL WORKS 514,800.00
12 PROVISIONAL WORKS AND PRIME COSTS 823,680.00
TOTAL 10,296,000.00

*Medium assumes construction in a periurban area with moderate labour costs, average finishes and a hybrid contract( part labour)

 

LUXURY COST
No. DESCRIPTION AMOUNT (Ksh)
1 SUBSTRUCTURE & GROUND FLOOR SLAB (PROVISIONAL) 2,620,800.00
2 REINFORCED CONCRETE FRAME 655,200.00
3 WALLING 786,240.00
4 ROOF STRUCTURE, COVERING AND RAINWATER DISPOSAL (PROVISIONAL) 786,240.00
5 WINDOWS 655,200.00
6 DOORS 524,160.00
7 INTERNAL FINISHES 3,276,000.00
8 EXTERNAL FINISHES 786,240.00
9 FITTING AND FIXTURES (JOINERY) 524,160.00
10 PROVISIONAL SUM FOR PLUMBING WORKS 786,240.00
11 PROVISIONAL SUM FOR ELECTRICAL WORKS 655,200.00
12 PROVISIONAL WORKS AND PRIME COSTS 1,048,320.00
TOTAL 13,104,000.00

*Luxury assumes construction in an urban area with high labour costs, high end finishes with a full contract engagement with the contractor