Kanga – 3 Bedroom Bungalow House Plan – ID B306

3 Bedrooms

174 sqm

2.5 bathrooms

1/8 acres

15x30meters

KSh 25,000.00

BUILDING COST ESTIMATES

1. SUBSTRUCTURE (ALL PROVISIONAL) & GROUND FLOOR SLAB 880,000.00
2. SUPERSTRUCTURE 220,000.00
3. WALLING 220,000.00
4. ROOF STRUCTURE, COVERING AND RAINWATER DISPOSAL ( PROVISIONAL ) 220,000.00
5.WINDOWS 220,000.00
6. DOORS 220,000.00
7. INTERNAL FINISHES 880,000.00
8. EXTERNAL FINISHES 220,000.00
9. FITTING AND FIXTURES (JOINERY) 220,000.00
10. MATERIALS FOR SANITARY APPLIANCES 440,000.00
11. PROVISIONAL WORKS AND PRIME COSTS 660,000.00
TOTAL 4,400,000.00

*Low Cost assumes construction in rural areas with low labor rates on a labor contract with budget finishes.

1. SUBSTRUCTURE (ALL PROVISIONAL) & GROUND FLOOR SLAB 929,280.00
2. SUPERSTRUCTURE 232,320.00
3. WALLING 232,320.00
4. ROOF STRUCTURE, COVERING AND RAINWATER DISPOSAL ( PROVISIONAL ) 232,320.00
5.WINDOWS 348,480.00
6. DOORS 348,480.00
7. INTERNAL FINISHES 1,452,000.00
8. EXTERNAL FINISHES 290,400.00
9. FITTING AND FIXTURES (JOINERY) 290,400.00
10. MATERIALS FOR SANITARY APPLIANCES 580,800.00
11. PROVISIONAL WORKS AND PRIME COSTS 871,200.00
TOTAL 5,808,000.00

*Medium assumes construction in a periurban area with moderate labour costs, average finishes and a hybrid contract( part labour)

1. SUBSTRUCTURE (ALL PROVISIONAL) & GROUND FLOOR SLAB 1,126,400.00
2. SUPERSTRUCTURE 281,600.00
3. WALLING 281,600.00
4. ROOF STRUCTURE, COVERING AND RAINWATER DISPOSAL ( PROVISIONAL ) 281,600.00
5.WINDOWS 422,400.00
6. DOORS 422,400.00
7. INTERNAL FINISHES 1,760,000.00
8. EXTERNAL FINISHES 352,000.00
9. FITTING AND FIXTURES (JOINERY) 352,000.00
10. MATERIALS FOR SANITARY APPLIANCES 704,000.00
11. PROVISIONAL WORKS AND PRIME COSTS 1,056,000.00
TOTAL 7,040,000.00

*Luxury assumes construction in an urban area with high labour costs, high end finishes with a full contract engagement with the contractor