BUILDING COST ESTIMATES

LOW COST
No. Description Amount (KES)
1 SUBSTRUCTURE & GROUND FLOOR SLAB (PROVISIONAL) 787,200.00
2 REINFORCED CONCRETE FRAME 196,800.00
3 WALLING 236,160.00
4 ROOF STRUCTURE, COVERING AND RAINWATER DISPOSAL (PROVISIONAL) 236,160.00
5 WINDOWS 196,800.00
6 DOORS 157,440.00
7 INTERNAL FINISHES 984,000.00
8 EXTERNAL FINISHES 236,160.00
9 FITTING AND FIXTURES (JOINERY) 157,440.00
10 PROVISIONAL SUM FOR PLUMBING WORKS 236,160.00
11 PROVISIONAL SUM FOR ELECTRICAL WORKS 196,800.00
12 PROVISIONAL WORKS AND PRIME COSTS 314,880.00
TOTAL 3,936,000.00

*Low Cost assumes construction in rural areas with low labor rates on a labor contract with budget finishes.

MEDIUM COST
No. Description Amount (KES)
1 SUBSTRUCTURE & GROUND FLOOR SLAB (PROVISIONAL) 1,082,400.00
2 REINFORCED CONCRETE FRAME 270,600.00
3 WALLING 324,720.00
4 ROOF STRUCTURE, COVERING AND RAINWATER DISPOSAL (PROVISIONAL) 324,720.00
5 WINDOWS 270,600.00
6 DOORS 216,480.00
7 INTERNAL FINISHES 1,353,000.00
8 EXTERNAL FINISHES 324,720.00
9 FITTING AND FIXTURES (JOINERY) 216,480.00
10 PROVISIONAL SUM FOR PLUMBING WORKS 324,720.00
11 PROVISIONAL SUM FOR ELECTRICAL WORKS 270,600.00
12 PROVISIONAL WORKS AND PRIME COSTS 432,960.00
TOTAL 5,412,000.00

*Medium assumes construction in a periurban area with moderate labour costs, average finishes and a hybrid contract( part labour)

HIGH COST
No. Description Amount (KES)
1 SUBSTRUCTURE & GROUND FLOOR SLAB (PROVISIONAL) 1,377,600.00
2 REINFORCED CONCRETE FRAME 344,400.00
3 WALLING 413,280.00
4 ROOF STRUCTURE, COVERING AND RAINWATER DISPOSAL (PROVISIONAL) 413,280.00
5 WINDOWS 344,400.00
6 DOORS 275,520.00
7 INTERNAL FINISHES 1,722,000.00
8 EXTERNAL FINISHES 413,280.00
9 FITTING AND FIXTURES (JOINERY) 275,520.00
10 PROVISIONAL SUM FOR PLUMBING WORKS 413,280.00
11 PROVISIONAL SUM FOR ELECTRICAL WORKS 344,400.00
12 PROVISIONAL WORKS AND PRIME COSTS 551,040.00
TOTAL 6,888,000.00

*Luxury assumes construction in an urban area with high labour costs, high end finishes with a full contract engagement with the contractor