Mamba – 3 Bedroom Bungalow – ID B355

3 Bedrooms

155 sqm

2.0 bathrooms

1/4 acres

30X30meters

Price range: KSh 25,000.00 through KSh 35,000.00

Price range: KSh 25,000.00 through KSh 35,000.00

BUILDING COST ESTIMATES

LOW COST
No. Description Amount (KES)
1 Substructure & Ground Floor Slab (Provisional) 992,000.00
2 Reinforced Concrete Frame 248,000.00
3 Walling 297,600.00
4 Roof Structure, Covering and Rainwater Disposal (Provisional) 297,600.00
5 Windows 248,000.00
6 Doors 198,400.00
7 Internal Finishes 1,240,000.00
8 External Finishes 297,600.00
9 Fitting and Fixtures (Joinery) 198,400.00
10 Provisional Sum for Plumbing Works 297,600.00
11 Provisional Sum for Electrical Works 248,000.00
12 Provisional Works and Prime Costs 396,800.00
TOTAL 4,960,000.00

*Low Cost assumes construction in rural areas with low labor rates on a labor contract with budget finishes.

MEDIUM COST
No. Description Amount (Ksh)
1 Substructure & Ground Floor Slab (Provisional) 1,364,000.00
2 Reinforced Concrete Frame 341,000.00
3 Walling 409,200.00
4 Roof Structure, Covering and Rainwater Disposal (Provisional) 409,200.00
5 Windows 341,000.00
6 Doors 272,800.00
7 Internal Finishes 1,705,000.00
8 External Finishes 409,200.00
9 Fitting and Fixtures (Joinery) 272,800.00
10 Provisional Sum for Plumbing Works 409,200.00
11 Provisional Sum for Electrical Works 341,000.00
12 Provisional Works and Prime Costs 545,600.00
TOTAL 6,820,000.00

*Medium assumes construction in a periurban area with moderate labour costs, average finishes and a hybrid contract( part labour)

LUXURY COST
No. Description Amount (Ksh)
1 Substructure & Ground Floor Slab (Provisional) 1,736,000.00
2 Reinforced Concrete Frame 434,000.00
3 Walling 520,800.00
4 Roof Structure, Covering and Rainwater Disposal (Provisional) 520,800.00
5 Windows 434,000.00
6 Doors 347,200.00
7 Internal Finishes 2,170,000.00
8 External Finishes 520,800.00
9 Fitting and Fixtures (Joinery) 347,200.00
10 Provisional Sum for Plumbing Works 520,800.00
11 Provisional Sum for Electrical Works 434,000.00
12 Provisional Works and Prime Costs 694,400.00
TOTAL 8,680,000.00

*Luxury assumes construction in an urban area with high labour costs, high end finishes with a full contract engagement with the contractor