BUILDING COST ESTIMATES

LOW COST
No. Description Amount (KES)
1 SUBSTRUCTURE & GROUND FLOOR SLAB (PROVISIONAL) 876,800.00
2 REINFORCED CONCRETE FRAME 219,200.00
3 WALLING 263,040.00
4 ROOF STRUCTURE, COVERING AND RAINWATER DISPOSAL (PROVISIONAL) 263,040.00
5 WINDOWS 219,200.00
6 DOORS 175,360.00
7 INTERNAL FINISHES 1,096,000.00
8 EXTERNAL FINISHES 263,040.00
9 FITTING AND FIXTURES (JOINERY) 175,360.00
10 PROVISIONAL SUM FOR PLUMBING WORKS 263,040.00
11 PROVISIONAL SUM FOR ELECTRICAL WORKS 219,200.00
12 PROVISIONAL WORKS AND PRIME COSTS 350,720.00
TOTAL 4,384,000.00

*Low Cost assumes construction in rural areas with low labor rates on a labor contract with budget finishes.

MEDIUM COST
No. Description Amount (KES)
1 SUBSTRUCTURE & GROUND FLOOR SLAB (PROVISIONAL) 1,205,600.00
2 REINFORCED CONCRETE FRAME 301,400.00
3 WALLING 361,680.00
4 ROOF STRUCTURE, COVERING AND RAINWATER DISPOSAL (PROVISIONAL) 361,680.00
5 WINDOWS 301,400.00
6 DOORS 241,120.00
7 INTERNAL FINISHES 1,507,000.00
8 EXTERNAL FINISHES 361,680.00
9 FITTING AND FIXTURES (JOINERY) 241,120.00
10 PROVISIONAL SUM FOR PLUMBING WORKS 361,680.00
11 PROVISIONAL SUM FOR ELECTRICAL WORKS 301,400.00
12 PROVISIONAL WORKS AND PRIME COSTS 482,240.00
TOTAL 6,028,000.00

*Medium assumes construction in a periurban area with moderate labour costs, average finishes and a hybrid contract( part labour)

LUXURY COST
No. Description Amount (KES)
1 SUBSTRUCTURE & GROUND FLOOR SLAB (PROVISIONAL) 1,534,400.00
2 REINFORCED CONCRETE FRAME 383,600.00
3 WALLING 460,320.00
4 ROOF STRUCTURE, COVERING AND RAINWATER DISPOSAL (PROVISIONAL) 460,320.00
5 WINDOWS 383,600.00
6 DOORS 306,880.00
7 INTERNAL FINISHES 1,918,000.00
8 EXTERNAL FINISHES 460,320.00
9 FITTING AND FIXTURES (JOINERY) 306,880.00
10 PROVISIONAL SUM FOR PLUMBING WORKS 460,320.00
11 PROVISIONAL SUM FOR ELECTRICAL WORKS 383,600.00
12 PROVISIONAL WORKS AND PRIME COSTS 613,760.00
TOTAL 7,672,000.00

*Luxury assumes construction in an urban area with high labour costs, high end finishes with a full contract engagement with the contractor