Nandi – 5 Bedroom + dsq Villa – ID V522

5 Bedrooms

314 sqm

5.5 bathrooms

1/4 acres

302X30meters

KSh 45,000.00

KSh 45,000.00

BUILDING COST ESTIMATES

LOW COST
No. Description Amount (Ksh)
1 SUBSTRUCTURE & GROUND FLOOR SLAB (PROVISIONAL) 2,009,600.00
2 REINFORCED CONCRETE FRAME 502,400.00
3 WALLING 602,880.00
4 ROOF STRUCTURE, COVERING AND RAINWATER DISPOSAL (PROVISIONAL) 602,880.00
5 WINDOWS 502,400.00
6 DOORS 401,920.00
7 INTERNAL FINISHES 2,512,000.00
8 EXTERNAL FINISHES 602,880.00
9 FITTING AND FIXTURES (JOINERY) 401,920.00
10 PROVISIONAL SUM FOR PLUMBING WORKS 602,880.00
11 PROVISIONAL SUM FOR ELECTRICAL WORKS 502,400.00
12 PROVISIONAL WORKS AND PRIME COSTS 803,840.00
TOTAL 10,048,000.00

*Low Cost assumes construction in rural areas with low labor rates on a labor contract with budget finishes.

MEDIUM COST
No. Description Amount (Ksh)
1 SUBSTRUCTURE & GROUND FLOOR SLAB (PROVISIONAL) 2,763,200.00
2 REINFORCED CONCRETE FRAME 690,800.00
3 WALLING 828,960.00
4 ROOF STRUCTURE, COVERING AND RAINWATER DISPOSAL (PROVISIONAL) 828,960.00
5 WINDOWS 690,800.00
6 DOORS 552,640.00
7 INTERNAL FINISHES 3,454,000.00
8 EXTERNAL FINISHES 828,960.00
9 FITTING AND FIXTURES (JOINERY) 552,640.00
10 PROVISIONAL SUM FOR PLUMBING WORKS 828,960.00
11 PROVISIONAL SUM FOR ELECTRICAL WORKS 690,800.00
12 PROVISIONAL WORKS AND PRIME COSTS 1,105,280.00
TOTAL 13,816,000.00

*Medium assumes construction in a periurban area with moderate labour costs, average finishes and a hybrid contract( part labour)

LUXURY COST
No. Description Amount (Ksh)
1 SUBSTRUCTURE & GROUND FLOOR SLAB (PROVISIONAL) 3,516,800.00
2 REINFORCED CONCRETE FRAME 879,200.00
3 WALLING 1,055,040.00
4 ROOF STRUCTURE, COVERING AND RAINWATER DISPOSAL (PROVISIONAL) 1,055,040.00
5 WINDOWS 879,200.00
6 DOORS 703,360.00
7 INTERNAL FINISHES 4,396,000.00
8 EXTERNAL FINISHES 1,055,040.00
9 FITTING AND FIXTURES (JOINERY) 703,360.00
10 PROVISIONAL SUM FOR PLUMBING WORKS 1,055,040.00
11 PROVISIONAL SUM FOR ELECTRICAL WORKS 879,200.00
12 PROVISIONAL WORKS AND PRIME COSTS 1,406,720.00
TOTAL 17,584,000.00

*Luxury assumes construction in an urban area with high labour costs, high end finishes with a full contract engagement with the contractor