BUILDING COST ESTIMATES

LOW COST
No. Description Amount (KES)
1 SUBSTRUCTURE & GROUND FLOOR SLAB (PROVISIONAL) 985,600.00
2 REINFORCED CONCRETE FRAME 246,400.00
3 WALLING 295,680.00
4 ROOF STRUCTURE, COVERING AND RAINWATER DISPOSAL (PROVISIONAL) 295,680.00
5 WINDOWS 246,400.00
6 DOORS 197,120.00
7 INTERNAL FINISHES 1,232,000.00
8 EXTERNAL FINISHES 295,680.00
9 FITTING AND FIXTURES (JOINERY) 197,120.00
10 PROVISIONAL SUM FOR PLUMBING WORKS 295,680.00
11 PROVISIONAL SUM FOR ELECTRICAL WORKS 246,400.00
12 PROVISIONAL WORKS AND PRIME COSTS 394,240.00
TOTAL 4,928,000.00

*Low Cost assumes construction in rural areas with low labor rates on a labor contract with budget finishes.

MEDIUM COST
No. Description Amount (KES)
1 SUBSTRUCTURE & GROUND FLOOR SLAB (PROVISIONAL) 1,355,200.00
2 REINFORCED CONCRETE FRAME 338,800.00
3 WALLING 406,560.00
4 ROOF STRUCTURE, COVERING AND RAINWATER DISPOSAL (PROVISIONAL) 406,560.00
5 WINDOWS 338,800.00
6 DOORS 271,040.00
7 INTERNAL FINISHES 1,694,000.00
8 EXTERNAL FINISHES 406,560.00
9 FITTING AND FIXTURES (JOINERY) 271,040.00
10 PROVISIONAL SUM FOR PLUMBING WORKS 406,560.00
11 PROVISIONAL SUM FOR ELECTRICAL WORKS 338,800.00
12 PROVISIONAL WORKS AND PRIME COSTS 542,080.00
TOTAL 6,776,000.00

*Medium assumes construction in a periurban area with moderate labour costs, average finishes and a hybrid contract( part labour)

LUXURY COST
No. Description Amount (KES)
1 SUBSTRUCTURE & GROUND FLOOR SLAB (PROVISIONAL) 1,724,800.00
2 REINFORCED CONCRETE FRAME 431,200.00
3 WALLING 517,440.00
4 ROOF STRUCTURE, COVERING AND RAINWATER DISPOSAL (PROVISIONAL) 517,440.00
5 WINDOWS 431,200.00
6 DOORS 344,960.00
7 INTERNAL FINISHES 2,156,000.00
8 EXTERNAL FINISHES 517,440.00
9 FITTING AND FIXTURES (JOINERY) 344,960.00
10 PROVISIONAL SUM FOR PLUMBING WORKS 517,440.00
11 PROVISIONAL SUM FOR ELECTRICAL WORKS 431,200.00
12 PROVISIONAL WORKS AND PRIME COSTS 689,920.00
TOTAL 8,624,000.00

*Luxury assumes construction in an urban area with high labour costs, high end finishes with a full contract engagement with the contractor