Simba – 3 Bedroom Bungalow – ID B301

3 Bedrooms

155 sqm

1 bathrooms

1/4 acres

15X30meters

Price range: KSh 25,000.00 through KSh 35,000.00

Price range: KSh 25,000.00 through KSh 35,000.00

BUILDING COST ESTIMATES

LOW COST
No. Description Amount (KES)
1 SUBSTRUCTURE & GROUND FLOOR SLAB (PROVISIONAL) 992,000.00
2 REINFORCED CONCRETE FRAME 248,000.00
3 WALLING 297,600.00
4 ROOF STRUCTURE, COVERING AND RAINWATER DISPOSAL (PROVISIONAL) 297,600.00
5 WINDOWS 248,000.00
6 DOORS 198,400.00
7 INTERNAL FINISHES 1,240,000.00
8 EXTERNAL FINISHES 297,600.00
9 FITTING AND FIXTURES (JOINERY) 198,400.00
10 PROVISIONAL SUM FOR PLUMBING WORKS 297,600.00
11 PROVISIONAL SUM FOR ELECTRICAL WORKS 248,000.00
12 PROVISIONAL WORKS AND PRIME COSTS 396,800.00
TOTAL 4,960,000.00

*Low Cost assumes construction in rural areas with low labor rates on a labor contract with budget finishes.

MEDIUM COST
No. Description Amount (KES)
1 SUBSTRUCTURE & GROUND FLOOR SLAB (PROVISIONAL) 1,364,000.00
2 REINFORCED CONCRETE FRAME 341,000.00
3 WALLING 409,200.00
4 ROOF STRUCTURE, COVERING AND RAINWATER DISPOSAL (PROVISIONAL) 409,200.00
5 WINDOWS 341,000.00
6 DOORS 272,800.00
7 INTERNAL FINISHES 1,705,000.00
8 EXTERNAL FINISHES 409,200.00
9 FITTING AND FIXTURES (JOINERY) 272,800.00
10 PROVISIONAL SUM FOR PLUMBING WORKS 409,200.00
11 PROVISIONAL SUM FOR ELECTRICAL WORKS 341,000.00
12 PROVISIONAL WORKS AND PRIME COSTS 545,600.00
TOTAL 6,820,000.00

*Medium assumes construction in a periurban area with moderate labour costs, average finishes and a hybrid contract( part labour)

LUXURY COST
No. Description Amount (KES)
1 SUBSTRUCTURE & GROUND FLOOR SLAB (PROVISIONAL) 1,736,000.00
2 REINFORCED CONCRETE FRAME 434,000.00
3 WALLING 520,800.00
4 ROOF STRUCTURE, COVERING AND RAINWATER DISPOSAL (PROVISIONAL) 520,800.00
5 WINDOWS 434,000.00
6 DOORS 347,200.00
7 INTERNAL FINISHES 2,170,000.00
8 EXTERNAL FINISHES 520,800.00
9 FITTING AND FIXTURES (JOINERY) 347,200.00
10 PROVISIONAL SUM FOR PLUMBING WORKS 520,800.00
11 PROVISIONAL SUM FOR ELECTRICAL WORKS 434,000.00
12 PROVISIONAL WORKS AND PRIME COSTS 694,400.00
TOTAL 8,680,000.00

*Luxury assumes construction in an urban area with high labour costs, high end finishes with a full contract engagement with the contractor