BUILDING COST ESTIMATES

LOW COST 
No. Description Amount (Ksh)
1 SUBSTRUCTURE & GROUND FLOOR SLAB (PROVISIONAL) 1,152,000.00
2 REINFORCED CONCRETE FRAME 288,000.00
3 WALLING 345,600.00
4 ROOF STRUCTURE, COVERING AND RAINWATER DISPOSAL (PROVISIONAL) 345,600.00
5 WINDOWS 288,000.00
6 DOORS 230,400.00
7 INTERNAL FINISHES 1,440,000.00
8 EXTERNAL FINISHES 345,600.00
9 FITTING AND FIXTURES (JOINERY) 230,400.00
10 PROVISIONAL SUM FOR PLUMBING WORKS 345,600.00
11 PROVISIONAL SUM FOR ELECTRICAL WORKS 288,000.00
12 PROVISIONAL WORKS AND PRIME COSTS 460,800.00
TOTAL 5,760,000.00

*Low Cost assumes construction in rural areas with low labor rates on a labor contract with budget finishes.

MEDIUM COST 
No. Description Amount (Ksh)
1 SUBSTRUCTURE & GROUND FLOOR SLAB (PROVISIONAL) 1,584,000.00
2 REINFORCED CONCRETE FRAME 396,000.00
3 WALLING 475,200.00
4 ROOF STRUCTURE, COVERING AND RAINWATER DISPOSAL (PROVISIONAL) 475,200.00
5 WINDOWS 396,000.00
6 DOORS 316,800.00
7 INTERNAL FINISHES 1,980,000.00
8 EXTERNAL FINISHES 475,200.00
9 FITTING AND FIXTURES (JOINERY) 316,800.00
10 PROVISIONAL SUM FOR PLUMBING WORKS 475,200.00
11 PROVISIONAL SUM FOR ELECTRICAL WORKS 396,000.00
12 PROVISIONAL WORKS AND PRIME COSTS 633,600.00
TOTAL 7,920,000.00

*Medium assumes construction in a periurban area with moderate labour costs, average finishes and a hybrid contract( part labour)

HIGH COST 
No. Description Amount (Ksh)
1 SUBSTRUCTURE & GROUND FLOOR SLAB (PROVISIONAL) 2,016,000.00
2 REINFORCED CONCRETE FRAME 504,000.00
3 WALLING 604,800.00
4 ROOF STRUCTURE, COVERING AND RAINWATER DISPOSAL (PROVISIONAL) 604,800.00
5 WINDOWS 504,000.00
6 DOORS 403,200.00
7 INTERNAL FINISHES 2,520,000.00
8 EXTERNAL FINISHES 604,800.00
9 FITTING AND FIXTURES (JOINERY) 403,200.00
10 PROVISIONAL SUM FOR PLUMBING WORKS 604,800.00
11 PROVISIONAL SUM FOR ELECTRICAL WORKS 504,000.00
12 PROVISIONAL WORKS AND PRIME COSTS 806,400.00
TOTAL 10,080,000.00

*Luxury assumes construction in an urban area with high labour costs, high end finishes with a full contract engagement with the contractor