Tai – 3 Bedroom Bungalow – ID B331

3 Bedrooms

252 sqm

1.5 bathrooms

1/8 acres

15X30meters

Price range: KSh 25,000.00 through KSh 35,000.00

Price range: KSh 25,000.00 through KSh 35,000.00

BUILDING COST ESTIMATES

LOW COST
No. Description Amount (KES)
1 SUBSTRUCTURE & GROUND FLOOR SLAB (PROVISIONAL) 1,612,800.00
2 REINFORCED CONCRETE FRAME 403,200.00
3 WALLING 483,840.00
4 ROOF STRUCTURE, COVERING AND RAINWATER DISPOSAL (PROVISIONAL) 483,840.00
5 WINDOWS 403,200.00
6 DOORS 322,560.00
7 INTERNAL FINISHES 2,016,000.00
8 EXTERNAL FINISHES 483,840.00
9 FITTING AND FIXTURES (JOINERY) 322,560.00
10 PROVISIONAL SUM FOR PLUMBING WORKS 483,840.00
11 PROVISIONAL SUM FOR ELECTRICAL WORKS 403,200.00
12 PROVISIONAL WORKS AND PRIME COSTS 645,120.00
TOTAL 8,064,000.00

*Low Cost assumes construction in rural areas with low labor rates on a labor contract with budget finishes.

MEDIUM COST
No. Description Amount (KES)
1 SUBSTRUCTURE & GROUND FLOOR SLAB (PROVISIONAL) 2,217,600.00
2 REINFORCED CONCRETE FRAME 554,400.00
3 WALLING 665,280.00
4 ROOF STRUCTURE, COVERING AND RAINWATER DISPOSAL (PROVISIONAL) 665,280.00
5 WINDOWS 554,400.00
6 DOORS 443,520.00
7 INTERNAL FINISHES 2,772,000.00
8 EXTERNAL FINISHES 665,280.00
9 FITTING AND FIXTURES (JOINERY) 443,520.00
10 PROVISIONAL SUM FOR PLUMBING WORKS 665,280.00
11 PROVISIONAL SUM FOR ELECTRICAL WORKS 554,400.00
12 PROVISIONAL WORKS AND PRIME COSTS 887,040.00
TOTAL 11,088,000.00

*Medium assumes construction in a periurban area with moderate labour costs, average finishes and a hybrid contract( part labour)

LUXURY COST
No. Description Amount (KES)
1 SUBSTRUCTURE & GROUND FLOOR SLAB (PROVISIONAL) 2,822,400.00
2 REINFORCED CONCRETE FRAME 705,600.00
3 WALLING 846,720.00
4 ROOF STRUCTURE, COVERING AND RAINWATER DISPOSAL (PROVISIONAL) 846,720.00
5 WINDOWS 705,600.00
6 DOORS 564,480.00
7 INTERNAL FINISHES 3,528,000.00
8 EXTERNAL FINISHES 846,720.00
9 FITTING AND FIXTURES (JOINERY) 564,480.00
10 PROVISIONAL SUM FOR PLUMBING WORKS 846,720.00
11 PROVISIONAL SUM FOR ELECTRICAL WORKS 705,600.00
12 PROVISIONAL WORKS AND PRIME COSTS 1,128,960.00
TOTAL 14,112,000.00

*Luxury assumes construction in an urban area with high labour costs, high end finishes with a full contract engagement with the contractor