Taya – 4 Bedroom Bungalow – ID B439

4 Bedrooms

371 sqm

4.5 bathrooms

1/8 acres

15X30meters

KSh 25,000.00

KSh 25,000.00

BUILDING COST ESTIMATES

LOW COST 
No. Description Amount (Ksh)
1 SUBSTRUCTURE & GROUND FLOOR SLAB (PROVISIONAL) 2,374,400.00
2 REINFORCED CONCRETE FRAME 593,600.00
3 WALLING 712,320.00
4 ROOF STRUCTURE, COVERING AND RAINWATER DISPOSAL (PROVISIONAL) 712,320.00
5 WINDOWS 593,600.00
6 DOORS 474,880.00
7 INTERNAL FINISHES 2,968,000.00
8 EXTERNAL FINISHES 712,320.00
9 FITTING AND FIXTURES (JOINERY) 474,880.00
10 PROVISIONAL SUM FOR PLUMBING WORKS 712,320.00
11 PROVISIONAL SUM FOR ELECTRICAL WORKS 593,600.00
12 PROVISIONAL WORKS AND PRIME COSTS 949,760.00
TOTAL 11,872,000.00

*Low Cost assumes construction in rural areas with low labor rates on a labor contract with budget finishes.

MEDIUM COST 
No. Description Amount (Ksh)
1 SUBSTRUCTURE & GROUND FLOOR SLAB (PROVISIONAL) 3,264,800.00
2 REINFORCED CONCRETE FRAME 816,200.00
3 WALLING 979,440.00
4 ROOF STRUCTURE, COVERING AND RAINWATER DISPOSAL (PROVISIONAL) 979,440.00
5 WINDOWS 816,200.00
6 DOORS 652,960.00
7 INTERNAL FINISHES 4,081,000.00
8 EXTERNAL FINISHES 979,440.00
9 FITTING AND FIXTURES (JOINERY) 652,960.00
10 PROVISIONAL SUM FOR PLUMBING WORKS 979,440.00
11 PROVISIONAL SUM FOR ELECTRICAL WORKS 816,200.00
12 PROVISIONAL WORKS AND PRIME COSTS 1,305,920.00
TOTAL 16,324,000.00

*Medium assumes construction in a periurban area with moderate labour costs, average finishes and a hybrid contract( part labour)

HIGH COST
No. Description Amount (Ksh)
1 SUBSTRUCTURE & GROUND FLOOR SLAB (PROVISIONAL) 4,155,200.00
2 REINFORCED CONCRETE FRAME 1,038,800.00
3 WALLING 1,246,560.00
4 ROOF STRUCTURE, COVERING AND RAINWATER DISPOSAL (PROVISIONAL) 1,246,560.00
5 WINDOWS 1,038,800.00
6 DOORS 831,040.00
7 INTERNAL FINISHES 5,194,000.00
8 EXTERNAL FINISHES 1,246,560.00
9 FITTING AND FIXTURES (JOINERY) 831,040.00
10 PROVISIONAL SUM FOR PLUMBING WORKS 1,246,560.00
11 PROVISIONAL SUM FOR ELECTRICAL WORKS 1,038,800.00
12 PROVISIONAL WORKS AND PRIME COSTS 1,662,080.00
TOTAL 20,776,000.00

*Luxury assumes construction in an urban area with high labour costs, high end finishes with a full contract engagement with the contractor