Twiga – 3 Bedroom Bungalow – ID B303

3 Bedrooms

122 sqm

1.5 bathrooms

1/8 acres

15X30meters

Price range: KSh 25,000.00 through KSh 35,000.00

Price range: KSh 25,000.00 through KSh 35,000.00

BUILDING COST ESTIMATES

LOW COST
No. Description Amount (KES)
1 SUBSTRUCTURE & GROUND FLOOR SLAB (PROVISIONAL) 780,800.00
2 REINFORCED CONCRETE FRAME 195,200.00
3 WALLING 234,240.00
4 ROOF STRUCTURE, COVERING AND RAINWATER DISPOSAL (PROVISIONAL) 234,240.00
5 WINDOWS 195,200.00
6 DOORS 156,160.00
7 INTERNAL FINISHES 976,000.00
8 EXTERNAL FINISHES 234,240.00
9 FITTING AND FIXTURES (JOINERY) 156,160.00
10 PROVISIONAL SUM FOR PLUMBING WORKS 234,240.00
11 PROVISIONAL SUM FOR ELECTRICAL WORKS 195,200.00
12 PROVISIONAL WORKS AND PRIME COSTS 312,320.00
TOTAL 3,904,000.00

*Low Cost assumes construction in rural areas with low labor rates on a labor contract with budget finishes.

MEDIUM COST
No. Description Amount (KES)
1 SUBSTRUCTURE & GROUND FLOOR SLAB (PROVISIONAL) 1,073,600.00
2 REINFORCED CONCRETE FRAME 268,400.00
3 WALLING 322,080.00
4 ROOF STRUCTURE, COVERING AND RAINWATER DISPOSAL (PROVISIONAL) 322,080.00
5 WINDOWS 268,400.00
6 DOORS 214,720.00
7 INTERNAL FINISHES 1,342,000.00
8 EXTERNAL FINISHES 322,080.00
9 FITTING AND FIXTURES (JOINERY) 214,720.00
10 PROVISIONAL SUM FOR PLUMBING WORKS 322,080.00
11 PROVISIONAL SUM FOR ELECTRICAL WORKS 268,400.00
12 PROVISIONAL WORKS AND PRIME COSTS 429,440.00
TOTAL 5,368,000.00

*Medium assumes construction in a periurban area with moderate labour costs, average finishes and a hybrid contract( part labour)

LUXURY COST
No. Description Amount (KES)
1 SUBSTRUCTURE & GROUND FLOOR SLAB (PROVISIONAL) 1,366,400.00
2 REINFORCED CONCRETE FRAME 341,600.00
3 WALLING 409,920.00
4 ROOF STRUCTURE, COVERING AND RAINWATER DISPOSAL (PROVISIONAL) 409,920.00
5 WINDOWS 341,600.00
6 DOORS 273,280.00
7 INTERNAL FINISHES 1,708,000.00
8 EXTERNAL FINISHES 409,920.00
9 FITTING AND FIXTURES (JOINERY) 273,280.00
10 PROVISIONAL SUM FOR PLUMBING WORKS 409,920.00
11 PROVISIONAL SUM FOR ELECTRICAL WORKS 341,600.00
12 PROVISIONAL WORKS AND PRIME COSTS 546,560.00
TOTAL 6,832,000.00

*Luxury assumes construction in an urban area with high labour costs, high end finishes with a full contract engagement with the contractor