Swahili- 4 Bedroom Villa- ID V518

4 Bedrooms

375 sqm

5.5 bathrooms

1/4 acres

30x30meters

BUILDING COST ESTIMATES

1 SUBSTRUCTURE & GROUND FLOOR SLAB (PROVISIONAL) 2,400,000.00
2 REINFORCED CONCRETE FRAME 600,000.00
3 WALLING 720,000.00
4 ROOF STRUCTURE, COVERING AND RAINWATER DISPOSAL (PROVISIONAL) 720,000.00
5 WINDOWS 600,000.00
6 DOORS 480,000.00
7 INTERNAL FINISHES 3,000,000.00
8 EXTERNAL FINISHES 720,000.00
9 FITTING AND FIXTURES (JOINERY) 480,000.00
10 PROVISIONAL SUM FOR PLUMBING WORKS 720,000.00
11 PROVISIONAL SUM FOR ELECTRICAL WORKS 600,000.00
12 PROVISIONAL WORKS AND PRIME COSTS 960,000.00
TOTAL 12,000,000.00

*Low Cost assumes construction in rural areas with low labor rates on a labor contract with budget finishes.

1 SUBSTRUCTURE & GROUND FLOOR SLAB (PROVISIONAL) 3,300,000.00
2 REINFORCED CONCRETE FRAME 825,000.00
3 WALLING 990,000.00
4 ROOF STRUCTURE, COVERING AND RAINWATER DISPOSAL (PROVISIONAL) 990,000.00
5 WINDOWS 825,000.00
6 DOORS 660,000.00
7 INTERNAL FINISHES 4,125,000.00
8 EXTERNAL FINISHES 990,000.00
9 FITTING AND FIXTURES (JOINERY) 660,000.00
10 PROVISIONAL SUM FOR PLUMBING WORKS 990,000.00
11 PROVISIONAL SUM FOR ELECTRICAL WORKS 825,000.00
12 PROVISIONAL WORKS AND PRIME COSTS 1,320,000.00
TOTAL 16,500,000.00

*Medium assumes construction in a periurban area with moderate labour costs, average finishes and a hybrid contract( part labour)

1 SUBSTRUCTURE & GROUND FLOOR SLAB (PROVISIONAL) 4,200,000.00
2 REINFORCED CONCRETE FRAME 1,050,000.00
3 WALLING 1,260,000.00
4 ROOF STRUCTURE, COVERING AND RAINWATER DISPOSAL (PROVISIONAL) 1,260,000.00
5 WINDOWS 1,050,000.00
6 DOORS 840,000.00
7 INTERNAL FINISHES 5,250,000.00
8 EXTERNAL FINISHES 1,260,000.00
9 FITTING AND FIXTURES (JOINERY) 840,000.00
10 PROVISIONAL SUM FOR PLUMBING WORKS 1,260,000.00
11 PROVISIONAL SUM FOR ELECTRICAL WORKS 1,050,000.00
12 PROVISIONAL WORKS AND PRIME COSTS 1,680,000.00
TOTAL 21,000,000.00

*Luxury assumes construction in an urban area with high labour costs, high end finishes with a full contract engagement with the contractor