| No. |
Description |
Amount (Ksh) |
| 1 |
Substructure & Ground Floor Slab (Provisional) |
2,880,000.00 |
| 2 |
Reinforced Concrete Frame |
720,000.00 |
| 3 |
Walling |
864,000.00 |
| 4 |
Roof Structure, Covering and Rainwater Disposal (Provisional) |
864,000.00 |
| 5 |
Windows |
720,000.00 |
| 6 |
Doors |
576,000.00 |
| 7 |
Internal Finishes |
3,600,000.00 |
| 8 |
External Finishes |
864,000.00 |
| 9 |
Fitting and Fixtures (Joinery) |
576,000.00 |
| 10 |
Provisional Sum for Plumbing Works |
864,000.00 |
| 11 |
Provisional Sum for Electrical Works |
720,000.00 |
| 12 |
Provisional Works and Prime Costs |
1,152,000.00 |
| TOTAL |
14,400,000.00 |
*Low Cost assumes construction in rural areas with low labor rates on a labor contract with budget finishes.
| No. |
Description |
Amount (Ksh) |
| 1 |
Substructure & Ground Floor Slab (Provisional) |
3,960,000.00 |
| 2 |
Reinforced Concrete Frame |
990,000.00 |
| 3 |
Walling |
1,188,000.00 |
| 4 |
Roof Structure, Covering and Rainwater Disposal (Provisional) |
1,188,000.00 |
| 5 |
Windows |
990,000.00 |
| 6 |
Doors |
792,000.00 |
| 7 |
Internal Finishes |
4,950,000.00 |
| 8 |
External Finishes |
1,188,000.00 |
| 9 |
Fitting and Fixtures (Joinery) |
792,000.00 |
| 10 |
Provisional Sum for Plumbing Works |
1,188,000.00 |
| 11 |
Provisional Sum for Electrical Works |
990,000.00 |
| 12 |
Provisional Works and Prime Costs |
1,584,000.00 |
| TOTAL |
19,800,000.00 |
*Medium assumes construction in a periurban area with moderate labour costs, average finishes and a hybrid contract( part labour)
| No. |
Description |
Amount (Ksh) |
| 1 |
Substructure & Ground Floor Slab (Provisional) |
5,040,000.00 |
| 2 |
Reinforced Concrete Frame |
1,260,000.00 |
| 3 |
Walling |
1,512,000.00 |
| 4 |
Roof Structure, Covering and Rainwater Disposal (Provisional) |
1,512,000.00 |
| 5 |
Windows |
1,260,000.00 |
| 6 |
Doors |
1,008,000.00 |
| 7 |
Internal Finishes |
6,300,000.00 |
| 8 |
External Finishes |
1,512,000.00 |
| 9 |
Fitting and Fixtures (Joinery) |
1,008,000.00 |
| 10 |
Provisional Sum for Plumbing Works |
1,512,000.00 |
| 11 |
Provisional Sum for Electrical Works |
1,260,000.00 |
| 12 |
Provisional Works and Prime Costs |
2,016,000.00 |
| TOTAL |
25,200,000.00 |
*Luxury assumes construction in an urban area with high labour costs, high end finishes with a full contract engagement with the contractor